Jump to content

Istanbul Airport: Difference between revisions

added STAR gallery
(Added Aprons and taxi)
(added STAR gallery)
Line 2: Line 2:


The airport has not been completed. As of January 2023, only Phase 1a and 1b is finished. The final phase of the airport includes 8 runways, 2 terminals with 1 satellite terminal.   
The airport has not been completed. As of January 2023, only Phase 1a and 1b is finished. The final phase of the airport includes 8 runways, 2 terminals with 1 satellite terminal.   
 
[[File:Istanbul Airport Current and Planned Layout.png|thumb|Istanbul Airport Current and Planned Layout]]
''[insert LTFM_Layout_FULLPHASE.png here]''


== Sceneries ==
== Sceneries ==
Line 102: Line 101:


==== North Config ====
==== North Config ====
''[insert STAR charts OR diagram here]''
<gallery>
File:ATPIX2A ERSEN-RIXEN2N.png|ATPIX 2A, ERSEN 2N and RIXEN 2N
File:ATPIX2N.png| ATPIX 2N
File:DRAMO2A INBET2A.png|DRAMO 2A and INBET 2A
File:ERSEN2A SISPI2A.png|ERSEN 2A and SISPI 2A
File:RILEX2A RIXEN2A.png|RILEX 2A and RIXEN 2A
File:RILEX2N.png|RILEX 2N
</gallery>


==== South Config ====
==== South Config ====
''[insert STAR charts OR diagram here]''
<gallery>
File:DRAMO-INBET2B 2P.png|DRAMO 2B, 2P and INBET 2B, 2P
File:ERSEN SISPI2B.png|ERSEN 2B and SISPI 2B
File:ERSEN SISPI2P.png|ERSEN 2P and SISPI 2P
File:RILEX RIXEN2B.png|RILEX 2B and RIXEN 2B
File:RIXEN2P ATPIX2B.png|RIXEN 2P and ATPIX 2B
</gallery>


=== Transitions and Approach Phase ===
=== Transitions and Approach Phase ===
approved
330

edits