Jump to content

Istanbul Airport: Difference between revisions

m
no edit summary
(Updated F1 gate)
mNo edit summary
Line 79: Line 79:
#* When the preferred RWY(s) are '''dry''' (RWYCC<ref>Runway Condition Code</ref> 6/6/6), '''the tail wind component is greater than 10 Kt''',
#* When the preferred RWY(s) are '''dry''' (RWYCC<ref>Runway Condition Code</ref> 6/6/6), '''the tail wind component is greater than 10 Kt''',
#* When RWYCC is reported at least 5 for any each the preferred RWY(s) third, the tail wind component is greater than 5 Kt,
#* When RWYCC is reported at least 5 for any each the preferred RWY(s) third, the tail wind component is greater than 5 Kt,
#* When RWYCC is reported at least 5 for any each the preferred RWY(s) third, there is a NOTAM/equivalent information (which may be included in the RCR) stating that the runway is slippery,ATIS announcement when PRS Operations are in progress shall be; “Preferential Runway Operations are in Progress”.
#* When RWYCC is reported at least 5 for any each the preferred RWY(s) third, there is a NOTAM/equivalent information (which may be included in the RCR) stating that the runway is slippery, ATIS announcement when PRS Operations are in progress shall be; “Preferential Runway Operations are in Progress”.
#* RWYCC is reported 4 or less any each the preferred RWY(s) third,
#* RWYCC is reported 4 or less any each the preferred RWY(s) third,
#* Meteorological conditions such as heavy rainfall, thunderstorm or wind-shear has been reported on the approach or climb path of the preferred RWY(s),
#* Meteorological conditions such as heavy rainfall, thunderstorm or wind-shear has been reported on the approach or climb path of the preferred RWY(s),
approved
330

edits