approved
330
edits
(Added Aprons and taxi) |
(added STAR gallery) |
||
| Line 2: | Line 2: | ||
The airport has not been completed. As of January 2023, only Phase 1a and 1b is finished. The final phase of the airport includes 8 runways, 2 terminals with 1 satellite terminal. | The airport has not been completed. As of January 2023, only Phase 1a and 1b is finished. The final phase of the airport includes 8 runways, 2 terminals with 1 satellite terminal. | ||
[[File:Istanbul Airport Current and Planned Layout.png|thumb|Istanbul Airport Current and Planned Layout]] | |||
== Sceneries == | == Sceneries == | ||
| Line 102: | Line 101: | ||
==== North Config ==== | ==== North Config ==== | ||
<gallery> | |||
File:ATPIX2A ERSEN-RIXEN2N.png|ATPIX 2A, ERSEN 2N and RIXEN 2N | |||
File:ATPIX2N.png| ATPIX 2N | |||
File:DRAMO2A INBET2A.png|DRAMO 2A and INBET 2A | |||
File:ERSEN2A SISPI2A.png|ERSEN 2A and SISPI 2A | |||
File:RILEX2A RIXEN2A.png|RILEX 2A and RIXEN 2A | |||
File:RILEX2N.png|RILEX 2N | |||
</gallery> | |||
==== South Config ==== | ==== South Config ==== | ||
<gallery> | |||
File:DRAMO-INBET2B 2P.png|DRAMO 2B, 2P and INBET 2B, 2P | |||
File:ERSEN SISPI2B.png|ERSEN 2B and SISPI 2B | |||
File:ERSEN SISPI2P.png|ERSEN 2P and SISPI 2P | |||
File:RILEX RIXEN2B.png|RILEX 2B and RIXEN 2B | |||
File:RIXEN2P ATPIX2B.png|RIXEN 2P and ATPIX 2B | |||
</gallery> | |||
=== Transitions and Approach Phase === | === Transitions and Approach Phase === | ||