Sabiha Gökçen Airport: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 71: Line 71:


== Preferential Runway System (PRS) ==
== Preferential Runway System (PRS) ==
The term “Preferential RWY System (PRS)” shall be used to indicate the runway that, at a particular time, is considered by the ATC unit to be the most suitable for use by the aircraft expected to land at or take-off from the aerodrome, by taking into consideration aircraft performance, surface wind speed and its components. PRS Operations contribute to the optimum use of airspace and aerodrome capacity.<blockquote><big>PPeferential RWYs for Sabiha Gökçen Airport (LTFJ) follow the LTFM runway configuration, provided that the tailwind component does not exceed 10 KT.</big></blockquote>
The term “Preferential RWY System (PRS)” shall be used to indicate the runway that, at a particular time, is considered by the ATC unit to be the most suitable for use by the aircraft expected to land at or take-off from the aerodrome, by taking into consideration aircraft performance, surface wind speed and its components. PRS Operations contribute to the optimum use of airspace and aerodrome capacity.<blockquote><big>Preferential RWYs for Sabiha Gökçen Airport (LTFJ) follow the LTFM runway configuration, provided that the tailwind component does not exceed 10 KT.</big></blockquote>
{| class="wikitable"
{| class="wikitable"
!RWYCC (Runway Condition Code)
!RWYCC (Runway Condition Code)
approved
330

edits